Back

CEM carries out Medium-voltage cable renovation works at Rua do Tarrafeiro

05 December 2013, Macau

In order to enhance medium voltage power supply network, CEM needs to build a road-crossing for cable linking urgently. The construction site is located at the section of Rua do Tarrafeiro between Rua dos Faitioes and Rua dos Colonos. During the construction period, the traffic in the construction area will be blocked.

In a bid to minimize the impact on the traffic in the area concerned, CEM will implement traffic flow control which has been agreed by the Transport Bureau. The construction work will start at 8:00pm on of December 7, 2013 and it is expected to be completed within 10 hours.

During the construction period, CEM would like to remind the drivers to be cautious about the road conditions and follow the temporary traffic signs and indicators. The Company would appreciate the public’s understanding for the inconveniences caused.

CEM has always worked closely and held regular meetings to coordinate the excavation works with the relevant government departments and other public utilities, ensuring that the excavation works are not carried out repeatedly within a short span of time. In addition, CEM strives to minimize the impact caused by the duration and scope of road works on citizens.

Previous
Next
Download CEM APP
google pay app store
© 2024 Companhia de Electricidade de Macau - CEM, S.A. All rights reserved.
CEM Website Terms of Use | Personal Data Collection Statement | Stay alert for phishing