|
It was reported to Engineering Department of CEM. After investigating,
CEM technicians considered that the temperature of the PT
met the standard. However, since Mr. Ip's bedroom was right
above the PT, he considered that the heat seriously affected
his daily life. After analyzing, DDI decided to install heat
insulation boards in the PT. The construction will be launched
in the middle of July. Engineering Department of CEM informed
Mr. Ip about the decision. He expressed that he felt satisfied
and hoped that the temperature will be thoroughly decreased
after the improvement.
|