1. How to Apply for New supply?
Applicant:
- Must be a property owner/tenant
Documents required:
- If the applicant is the property owner:
— ID copy of the property owner [1]
— Copy of Property Registration Report issued by Macau Land and Real Estate Registry Office (CRPM) (valid within three months) [2]
- If the applicant is the tenant:
— ID copies of both owner and tenant [1]
— Original and copy of lease
— Copy of Property Registration Report issued by CRPM
For lease with testimony by lawyer, ID copy of the owner is not required.
Charges:
- Deposit (according to the subscribed demand)
Time elapsed:
- Within three working days [3]
Remarks:
- If the applicant is under a company name, copy of business registration is required
- If subscribed demand exceeds 13.8kVA, a 7th Category License issued by the Lands, Public Works & Transport Bureau (DSSOPT) and name of qualified electrician (registered in CEM) responsible for electrical installation are required)
2. How to Apply for Temporary Contract?
Documents to be presented:
- Copy of applicant identification [1] and copy of business registration if the applicant name is a company;
- Map of scale 1:1000 of the site location proposed to the temporary switchboard;
- Description in one A4 page with the requested subscribed demand (kVA), operating current (mA) of residual current circuit breaker, shortcircuit breaking capacity (kA) of the incoming circuit breaker, purpose of the supply (building construction, foundations works, exhibition, trade fair, festival or other temporary installation), and period for the use of temporary supply;
- Schematic electrical diagram of temporary switchboard installation;
- Name of the electrician (registered in CEM) responsible for the work in the electrical installation;
- Copy of license for foundation works, building construction or public work issued by Lands, Public Works & Transport Bureau (DSSOPT); or
copy of license issued by the respective government bureau for trade fair, exhibition, festival or other temporary installation.
Charges:
- Connection charges according to the following types of temporary installations:
— New building construction [4]
— Public Works sites
— Trade fair, exhibition, festival or other temporary installation - Deposit according to the requested subscribed demand
Time elapsed:
- The connection of the requested temporary supply depends on the approval of electrical installation on the site, payment of the respective charges and nature and dimension of CEM job
3. How to Apply for New Building Supply?
Documents to be presented:
- Copy of applicant identification [1] and copy of business registration if the applicant name is a company;
- 2(two) copies of map of the site location with scale of 1:1000;
- 2(two) copies of the Electrical Project (including descriptive report, drawings, attributed demand list, etc.) with rubber stamp as approved by Lands, Public Works & Transport Bureau (DSSOPT);
- 2(two) copies of the building construction license issued by DSSOPT;
- 2(two) copies of Building Premises Description, with rubber stamp as approved by DSSOPT;
- Name of the electrician (registered in CEM) responsible for the works in the electrical installation of the new building.
Charges:
- Connection charges calculated based on subscribed demand for the building, according to the Administrative Regulation no. 11/2005 of July 18 and Executive Order no. 31/2005 of July 18.
Time elapsed:
- CEM engineering works will be carried out after payment of respective charges, conclusion and approval of the works under constructor responsibility (communal electrical installation, service entrance cables, and civil construction of distribution substation room if required) and CEM job license issued by the respective government bureau. Then the new building will be connected to the network within 90 days.
- CEM is open to discuss with the applicant one schedule more convenient and acceptable for both sides.
4. How to Apply for Removal of Electrical Infrastructure?
Documents to be presented:
- Copy of applicant identification [1];
- 2(two) copies of map of the site location with scale of 1:1000;
- 1(one) copy of license for demolishing, renovation, foundation or construction works issued by Lands, Public Works & Transport Bureau (DSSOPT), if necessary .
Charges:
- Applicants will be informed on the job costs incurred, if any.
Time elapsed:
- Depends on the nature and dimension of the job to be carried out by CEM.
Notes:
[1] BIR, HK ID, PRC ID or Passports of different countries
[2] Copy of property transaction contract/Three-party contract/Housing Deed/latest property tax document/Stamp duty (M1 & M2) can be provided but is subject to approval
[3] Refers to free access to the electrical installation
[4] Connection charges are only applicable to Medium Voltage supply, and for increase of power demand (either in Medium Voltage or Low Voltage) for already installed temporary supply.