Generation

The actual capacity of CEM’s generation consists of three power stations located respectively in the Macau City namely Macau Power Station (CMC) and two on the Coloane Island namely Coloane A Power Station (CCA) and Coloane B Power Station (CCB). Together, CEM has a total installed capacity of 472 MW.

The predominant type of generation technology deployed are the low speed diesel generator (CCA) and the combined cycle gas turbine (CCB). In fact, these 2 kinds of generating units make up of 58% and 29% of total capacity installed and generated as much as 99.9% and 0.1% of total electricity production in 2013 respectively.

In 2013, the gross energy demand was 4409 GWh of which 222 GWh was produced by CEM and 4187 GWh has acquired from external suppliers. The energy breakdowns between CEM production and energy acquisition were respectively 5% and 95%. And the annual growth rate was 1.5%. The maximum values registered for energy and daily load demands were respectively 16.1 GWh and 765.6 MW.

Macao Power Station
Generator Type Commercial Operation Installed Capacity
MW MVA
Gas Turbine      
T22
T23
1973
1973
15.1
15.1
20.8
20.8
Diesel Fuel-oil      
D25
D26
D27
D28
1983
1983
1983
1983
8.5
8.5
8.5
8.5
10.6
10.6
10.6
10.6
Total 64.2 84.0


Coloane Power Station - A
Generator Type Commercial Operation Installed Capacity
MW MVA
Steam Turbine      
G01
G02
1978
1978
20.0
20.0
25.0
25.0
Diesel Fuel-oil      
G03
G04
G05
G06
G07
G08
1987
1988
1991
1992
1995
1996
24.0
24.0
38.6
38.6
53.1
53.1
30.0
30.0
48.3
48.3
66.4
66.4
Total 271.4 339.3

Coloane Power Station - B
Generator Type Commercial Operation Installed Capacity
MW MVA
Cycle Combined      
GT1
GT2
ST1
2002
2003
2003
45.1
45.1
46.2
56.4
56.4
57.7