Change of Contractual Terms

1. How to Apply for Change of Subscribed Demand?

Applicant:

  • Must be the electricity supply contract holder

Documents required:

  • ID copy of applicant [1]

Charges:

  • Additional connection charges are applied if the requested subscribed demand is higher than the registered supply capacity for the premises
  • Job cost (if necessary)
  • Difference of existing and newly required deposit

Time elapsed:

  • Within three working days [2] [3]

Remarks:

  • If the applicant is under a company name, copy of business registration is required
  • If subscribed demand exceeds 13.8kVA,, a 7th Category License issued by the Lands, Public Works & Transport Bureau (DSSOPT) and name of qualified electrician (registered in CEM) responsible for electrical installation are required

2. How to Apply for Change of Contract Name?

Applicant:

  • Must be a property owner/tenant

Documents required:

  • If the applicant is the property owner:
    — ID Copy of the property owner [1]
    — Copy of Property Registration Report issued by CRPM (valid within three months) [4]
    — Electricity bill
  • If the applicant is the tenant:
    — ID copies of both owner and tenant [1]
    — Original and copy of lease
    — Copy of Property Registration Report issued by CRPM
    — Electricity bill

For lease with testimony by lawyer, ID copy of the owner is not required.

Charges:

  • Outstanding balance of the applied contract
  • Deposit (according to the subscribed demand)

Time elapsed:

  • Immediately

Remarks:

  • If the applicant is under a company name, copy of business registration is required
  • If subscribed demand exceeds 13.8kVA, a 7th Category License issued by the Lands, Public Works & Transport Bureau (DSSOPT) and name of qualified electrician (registered in CEM) responsible for electrical installation are required

Notes:

[1] BIR, HK ID, PRC ID or Passports of different countries

[2] Refers to free access to the electrical installation

[3] Refers to the approval of the electrical work needed on the installation and payment of respective charges

[4] Copy of property transaction contract/Three-party contract/Housing Deed/latest property tax document/Stamp duty (M1 & M2) can be provided but is subject to approval.